🔒 Please log in to use tool features (fill sample / analyze / AI interpretation / export document)
HomeQuality ToolsAdvanced SPC Control ChartsPrecontrol Chart (Rainbow Chart)
Precontrol Chart (Rainbow Chart)Free online tool · works on PC and mobile
Use it now →

Precontrol Chart: Fast Go/No-Go Judgment for Short Runs

What is the Precontrol Chart?

Precontrol uses specification limits instead of statistical control limits: the distance from the specification center to the limit is divided so the green zone is the central half of the tolerance, yellow zones the next quarter on each side, and red beyond the specification. The P-line is the green boundary, halfway from the specification center to the limit. Consecutive sampling decides: green passes, yellow warns, red stops the line — directly judging product conformance without accumulating history.

When to Use It

Use it for short batches, frequent changeovers and low volumes where conventional control charts cannot be built, for pilot runs and new-product introduction, and for rapid patrol checks on small-batch, multi-product lines. It works as a quality gate within minutes; once volume stabilizes, the process can transition smoothly to conventional control charts.

How to Use It (Step by Step)

Set the specification limits and sample consecutively: two consecutive points in yellow on the same side, or any red point, means stop and adjust; five consecutive green points mean the process is stable and production continues. The tool draws the three zones and states the required shop-floor action, turning the judgment directly into an operating instruction.

Key Formulas / Example

The P-line sits at the midpoint between the specification center and the specification limit; green covers the central 50% of the tolerance, yellow the outer quarter on each side, and red lies beyond the specification. Precontrol does not estimate CpK — use the CpK tool for quantified capability.

Open Precontrol Chart (Rainbow Chart) → Calculate online in your browser · free registration · PC and mobile
SPC Discussions · Latest
No discussions yet — be the first to ask a question in the community.
Frequently Asked Questions
How is precontrol different from an ordinary control chart?
An ordinary chart uses statistical control limits to judge whether the process is in control; precontrol uses specification limits to judge whether the product is acceptable, needing no 20–25 subgroups and suiting rapid short-run judgment.
Do two yellow points really stop the line?
Yes. Two consecutive yellow points on the same side indicate the process center has probably shifted, so continuing production is risky; adjust and restart precontrol.
Can precontrol replace CpK?
No. Precontrol only gives a fast acceptable/not-acceptable judgment and does not quantify capability; use the CpK tool whenever capability data such as customer submissions are required.