🔒 Please log in to use tool features (fill sample / analyze / AI interpretation / export document)
HomeQuality ToolsSPC Control ChartsXbar-R Chart (Mean-Range)
Xbar-R Chart (Mean-Range)Free online tool · works on PC and mobile
Use it now →

Xbar-R Control Chart: The Most Used Variable Control Chart

What is an Xbar-R Chart?

The Xbar-R chart combines a mean chart (Xbar) and a range chart (R): the Xbar chart monitors the mean of each subgroup and reflects shifts in process location, while the R chart monitors the subgroup range (maximum minus minimum) and reflects shifts in process spread. It is the most widely used variable control chart in industrial production.

When to Use It

Use it when the data are variable (continuous measurements) and each subgroup has 2-8 samples, for example measuring 5 parts per shift or weighing 3 pieces per hour. With more than 8 samples per subgroup, switch to Xbar-s because the standard deviation uses more information than the range. With one value per subgroup, use I-MR.

How to Read It

Read the R chart first: an out-of-control range means within-subgroup variation has grown, so investigate measurement or process-dispersion causes first. Once the R chart is stable, read the Xbar chart: an out-of-control mean means the process center has shifted or a systematic factor exists. The tool flags points automatically by the eight run rules and gives a judgement hint.

Control Limits

Xbar chart: UCL/LCL = Xbar +/- A2*Rbar. R chart: UCL = D4*Rbar and LCL = D3*Rbar (for n less than 7, D3 = 0, so the R chart has no lower limit). A2, D3 and D4 are constants that depend on subgroup size n; the tool holds the constant tables and calculates automatically.

Open Xbar-R Chart (Mean-Range) → Calculate online in your browser · free registration · PC and mobile
SPC Discussions · Latest
No discussions yet — be the first to ask a question in the community.
Frequently Asked Questions
How should subgroups be formed for an Xbar-R chart?
Group by time order (e.g., consecutive samples within a shift or hour); within-subgroup variation reflects short-term noise and between-subgroup variation reflects long-term drift. Do not cherry-pick parts for grouping.
R chart out of control but Xbar chart fine - what does it mean?
Within-subgroup dispersion has widened - common causes include larger measurement error, raw-material batch differences and equipment wear. Resolve the R chart problem before judging the mean.
How many samples per subgroup is best?
Usually 3-5, balancing economy and sensitivity; collect at least 20-25 subgroups to establish initial control limits.