FAI First Article Inspection: Build an AS9102-Compliant Report

What is FAI?

First Article Inspection (FAI) is the complete dimensional, material and functional verification of one or more parts from the first production run, confirming that the manufacturing process consistently meets drawing and specification requirements. In aerospace, FAI is performed to AS9102, which requires a systematic inspection and report for every new part or after a process change. The completed report should be reviewed and signed by quality and engineering owners and delivered with the first production batch.

When to Use It

Use it before first mass production of a new product, and again after design or process changes, tooling or equipment replacement, or restart after an extended production stoppage. It is also required when submitting FAI reports to aerospace primes and customers, and when reviewing supplier first article reports. Key and safety characteristics can be flagged with stars so auditors prioritize them.

How to Use It (Step by Step)

Complete the three AS9102 forms: Form 1 records part accountability such as part number, revision, batch and supplier; Form 2 lists each part characteristic with drawing reference, tolerance, measured value and verdict; Form 3 records material certifications, special processes and functional test evidence. The tool guides data entry by form structure, auto-numbers by drawing number and revision, and summarizes results.

Key Formulas / Example

There is no scoring formula; the deliverable is the three-form report with measured values for every characteristic. Record actual measured values rather than pass/fail verdicts alone. Remember that drawing revisions, changes of manufacturing location, or restart after a long stoppage require a new FAI per AS9102.

Open FAI First Article Inspection (AS9102) → Calculate online in your browser · free registration · PC and mobile
AEROSPACE Discussions · Latest
No discussions yet — be the first to ask a question in the community.
Frequently Asked Questions
When must FAI be redone?
AS9102 requires a new first article inspection after design changes, process method changes, manufacturing location changes, or restart after an extended stoppage; follow the exact contract terms with your customer.
What is the difference between FAI and PPAP?
FAI is the aerospace first article verification per AS9102, while PPAP is the automotive production part approval process per AIAG. The purpose is similar but the forms and workflow differ.
Must FAI cover all characteristics?
In principle it covers all drawing characteristics. With customer approval, a representative sampling strategy may be used for some characteristics, but key and safety characteristics must be fully inspected.